Phase 1. Wheels in the field
Entry condition: W1 completes the evaluation harness at 95 percent on ward delivery in the lab, running Brain in Solo mode with a third-party audit of its offline mode. Deployment: one hospital through RoMi-H as the first Crew site, with W1 and a Brain Kit body sharing one site memory, and Punggol Digital District alongside. Crew in front of at least one other vendor's fleet.
Phase 2. Legs on the deck
Entry condition: B1 completes 100 hours on the deck mock-up without a fall requiring repair. Deployment: Tuas Living Lab lashing trials with PSA, the first biped port deployment anywhere with published outcome data.
Phase 3. Region
Entry condition: two paying sites with published scoreboards. Markets: ASEAN, Japan, Korea, the Gulf, Europe. The United States through arms and Crew as software.
What we prove in eighteen months
- Solo on W1 — Brain — Months 0–6
- Crew on one site server — Brain — Months 6–12
- Multi-writer memory benchmark — Brain — Months 6–12
- Sealed hand v1 — Body — Months 0–6
- C1 pilot unit, gated on audit correlation — Body — Months 0–10
- B1 on the niche PSA has named — Body — Months 12–18
- Hospital basement offline run — Sites — Months 0–6
- Three-robot mixed team — Sites — Months 12–18
- Phase gate — Months 6 — W1 at 95 percent on the harness
- Phase gate — Months 12 — B1 100 hours on the deck mock-up
- Phase gate — Months 18 — Two paying sites with published scoreboards
| Months | Proof |
|---|---|
| 0 to 6 | Solo on W1: policy at 10 Hz and local planner on Thor T4000; an offline delivery run in a hospital basement; signed firmware and no-telemetry audit by a third party |
| 0 to 6 | Sealed hand v1 with published cycle-life rig data; calibrated fingertip paper submitted after IP review |
| 6 to 12 | Crew on one site server with W1 and a Brain Kit body: shared scene graph, episodic log with provenance, RoMi-H adapter, lift and door handoff; published link-loss and re-sync numbers |
| 6 to 12 | A multi-writer robot memory benchmark released with baseline results |
| 0 to 10 | Tidewell C1, a restroom-cleaning pilot unit on the W1 platform, supervised in one hospital toilet block; the programme continues past month 10 only if its cleanliness score correlates with ATP and fluorescent-marker audits well enough for the hospital's infection-control team to accept it |
| 12 to 18 | A three-robot mixed team at a hospital or Punggol with monthly published reliability numbers |
| 12 to 18 | B1 on a legged niche PSA has named, with outcome data |
Watch dates
| Date | Event |
|---|---|
| September 2026 | US Section 232 robotics tariff decision expected |
| 10 November 2026 | China's extraterritorial rare-earth rules resume unless extended |
| Late 2026 | NVIDIA reference humanoid ships |
| Late 2026 | Tuas Living Lab fully operational |
| 1 January 2028 | US Conditional Approval deadline for foreign-produced mobile robots |