Three phases, each with an entry condition rather than a date.

5 September 2026

Phase 1. Wheels in the field

Entry condition: W1 completes the evaluation harness at 95 percent on ward delivery in the lab, running Brain in Solo mode with a third-party audit of its offline mode. Deployment: one hospital through RoMi-H as the first Crew site, with W1 and a Brain Kit body sharing one site memory, and Punggol Digital District alongside. Crew in front of at least one other vendor's fleet.

Phase 2. Legs on the deck

Entry condition: B1 completes 100 hours on the deck mock-up without a fall requiring repair. Deployment: Tuas Living Lab lashing trials with PSA, the first biped port deployment anywhere with published outcome data.

Phase 3. Region

Entry condition: two paying sites with published scoreboards. Markets: ASEAN, Japan, Korea, the Gulf, Europe. The United States through arms and Crew as software.

What we prove in eighteen months

Eighteen months of proofs on one axis, with the gate that opens each phaseBrainBodySitesSolo on W1Crew on one site serverMulti-writer memory benchmarkSealed hand v1C1 pilot unit, gated on audit correlationB1 on the niche PSA has namedHospital basement offline runThree-robot mixed team061218Months6W1 at 95 percent on the harness12B1 100 hours on the deck mock-up18Two paying sites with published scoreboardsProof we publishPhase gate
  • Solo on W1 — Brain — Months 0–6
  • Crew on one site server — Brain — Months 6–12
  • Multi-writer memory benchmark — Brain — Months 6–12
  • Sealed hand v1 — Body — Months 0–6
  • C1 pilot unit, gated on audit correlation — Body — Months 0–10
  • B1 on the niche PSA has named — Body — Months 12–18
  • Hospital basement offline run — Sites — Months 0–6
  • Three-robot mixed team — Sites — Months 12–18
  • Phase gate — Months 6 — W1 at 95 percent on the harness
  • Phase gate — Months 12 — B1 100 hours on the deck mock-up
  • Phase gate — Months 18 — Two paying sites with published scoreboards
A phase opens on its entry condition, not on a date. The bars are the proofs the table below spells out.
MonthsProof
0 to 6Solo on W1: policy at 10 Hz and local planner on Thor T4000; an offline delivery run in a hospital basement; signed firmware and no-telemetry audit by a third party
0 to 6Sealed hand v1 with published cycle-life rig data; calibrated fingertip paper submitted after IP review
6 to 12Crew on one site server with W1 and a Brain Kit body: shared scene graph, episodic log with provenance, RoMi-H adapter, lift and door handoff; published link-loss and re-sync numbers
6 to 12A multi-writer robot memory benchmark released with baseline results
0 to 10Tidewell C1, a restroom-cleaning pilot unit on the W1 platform, supervised in one hospital toilet block; the programme continues past month 10 only if its cleanliness score correlates with ATP and fluorescent-marker audits well enough for the hospital's infection-control team to accept it
12 to 18A three-robot mixed team at a hospital or Punggol with monthly published reliability numbers
12 to 18B1 on a legged niche PSA has named, with outcome data

Watch dates

DateEvent
September 2026US Section 232 robotics tariff decision expected
10 November 2026China's extraterritorial rare-earth rules resume unless extended
Late 2026NVIDIA reference humanoid ships
Late 2026Tuas Living Lab fully operational
1 January 2028US Conditional Approval deadline for foreign-produced mobile robots