Work with us
Five doors. Each says what to send first.
Operators
Port, airport, 3PL, hospital and eldercare teams with a task to automate.
What to send first
The site, the task, the shift pattern and the timeline. A pilot is eight to twelve weeks with our engineers on site, a data agreement and a published scoreboard.
Investors
Stage, deck and how to request it.
What to send first
Your fund, stage and thesis. We send the deck, which covers the five verdicts, product status, pilot pipeline, team and the capital plan.
Grants officers
Programmes we fit and the evidence we can supply.
What to send first
The programme, the evidence format you need and the deadline. We fit robotics, embodied AI, advanced manufacturing and healthcare productivity calls.
Engineers and candidates
Open roles across mechanical, electrical, controls, safety, ML and software.
What to send first
A short note on what you have built and a link. Roles below, or apply openly.
Open roles
- ControlsControls and robotics engineer, wet-zone base
Bring up a new base on the W1 platform for restroom cleaning: ROS 2 on Jetson, docking repeatability, safety-rated stop behaviours.
- ElectronicsEmbedded and electronics engineer, wet-zone hardware
Low-voltage power, sealed harnessing, potting and sensor electronics for a wet-zone body on the W1 platform.
- MechanicalMechanical and fluids lead, wet-zone body
Own the fluid paths, wetted materials, sealing and tool heads of a wet-zone body on the W1 platform for restroom cleaning.
- Machine learningPerception and policy engineer, contact tasks
Force-controlled contact policies and on-device fixture perception for a wet-zone body on the W1 platform, trained on our own data.
- ControlsControls engineer, whole-body and locomotion
Whole-body control for W1 and B1, sim-to-real on our own actuators, safety-rated stop behaviours.
- MechanicalMechanical engineer, hands and actuation
Design and iterate dexterous hands and tactile fingertips on commodity actuators. Own the deck mock-up.
- Machine learningMachine learning engineer, post-training
Post-train open VLA models on deployment data, run the evaluation harness, publish results.
- SafetyFunctional safety engineer
Take W1 through ISO 13482 and ISO 3691-4, IEC 61508 safety functions, IMDA registration and UN 38.3.
Researchers
Joint projects, data sharing and publications.
What to send first
The research question and what data or hardware access would help. We share deployment data under agreement and co-author.
What a pilot looks like
- 01
Enquiry
Send the site, task, shift pattern and timeline.
- 02
Visit and agreement
A site visit, then a data agreement.
- 03
Pilot on site
Eight to twelve weeks with our engineers on site.
- 04
Scoreboard
The scoreboard is published.